Reporting
Reporting Schedule | |
FY 2024-2025 |
Monthly Report Checklist | |
Revision | Uploaded 8/28/2024 |
Quarterly Report Checklist | |
Revision | Uploaded 8/28/2024 |
Policy
Pretreatment Program Policies | |
Revision 0 | Uploaded 3/18/2015 |
Pretreatment Program Procedures | |
Revision 01 | Uploaded 3/18/2015 |
Enforcement Response Plan | |
Revision 0 | Uploaded 3/18/2015 |
Ordinance No. 8 | |
Revision 0 | Uploaded 5/23/2018 |
Permits & Discharge Request Templates
CIU Permit Template | |
Revision 06 | Uploaded 2/3/2021 |
SIU Permit Template | |
Revision 08 | Uploaded 2/3/2021 |
IU Permit Template | |
Revision 09 | Uploaded 2/3/2021 |
Emergency Permit Template | |
Revision 0 | Uploaded 3/18/2015 |
LWH Permit Template | |
Revision 0 | Uploaded 6/30/2020 |
Permit Fact Sheet Template | |
Revision 1 | Uploaded 6/17/2020 |
Discharge Permit Application | |
Revision 1 | Uploaded 5/23/2018 |
Letter to Discharge – Template | |
Revision 0 | Uploaded 10/20/2022 |
Letter to Discharge – Request (fillable PDF) | |
Revision 0 | Uploaded 10/20/2022 |
Forms
Inspection Report | |
Revision 1 | Uploaded 5/19/2022 |
iPACS Manuals | |
Revision 0 | Uploaded 6/24/2015 |
Manifest Form | |
Revision 0 | Uploaded 6/24/2015 |
Training
Inter-Agency Training |
Inspection Training Schedule FY 2024-2025 |
Inspection Documentation Refresher – 4/21/2022 |
Training Video |
iPACS Guidance – Inspection & Enforcement Summaries |
Cheat Sheet – Inspection Form Item Descriptions |
Violation and Enforcement Refresher – 2/15/2024 |
Training Video |
Refresher Agenda and Reminders |
iPACS Guidance – Violation & Enforcement Summaries |
Truckers, or Liquid Waste Haulers, are permitted commercial salty wastewater haulers that disposes of salty wastewater at one of the four Brine Line Collection Stations from our indirect dischargers. Click here to find a complete list of permitted salty wastewater haulers.
If you are trucker that is interested in becoming a permitted salty wastewater hauler use the following documents:
Brine Line Scale and Solids Imbalance
Memo – 2010 Monitoring Final March WQ Sampling (CDM 8/9/10)
Memo – Draft Phase 2 Solids Control Study Bench Testing Results (CDM 11/8/10)
Memo – Draft Solids Control Alternative Conceptual Costs (CDM 4/1/11)
Brine Line TSS Formation Workshop (12/20/11)
Presentation – IEUA Sulfide Formation Sampling Campaign (10/1/12)
SAWPA Solids Formation Workshop (3/8/16)
Nature of Particulate Solids in Brine Line (4/7/16)
Brine Line WQ Monitoring & Solids Formation Recovery Formula Report (9/5/19)
Salinity Management Program
Phase 1 Salinity Management Plan – January 2010
Phase 2 Planning TM – May 2010
Phase 3 Operations TM – May 2010
PDR-Final Drawings – IVA Lower Drawings – IVA Upper Drawings – IVB
Brine Line Marketing Plan – Final Draft, August 2009
Final Sewer System Management Plan Volume 1
Final Sewer System Management Plan Volume 2
Final Sewer System Management Plan Executive Summary
Resolutions
Resolution No. 2024-3 Establishing the Purchase Price for Treatment and Disposal Rights in the Inland Empire Brine Line
Resolution No. 2024-5 Establishing the Rates (For the Treatment and Disposal of Non-Reclaimable Wastewater, Temporary Domestic Wastewater, Collection Station Discharges, and Charges for Suspended Solids and Biochemical Oxygen Demand) in the Inland Empire Brine Line and Rescinding Resolution No. 2023-5 (Effective 5/21/2024)
Resolution No. 2017-11 Establish Local Permit Limits and Best Management Practices Requirements
Resolution No. 295 Establish Price for Purchasing Discharge Rights (7/8/97)
Resolution No. 299 Authorizing Emergency Discharges of Qualified Wastewater into the Brine Line
Ordinance No. 8 Establish Regulations for Use of the Inland Empire Brine Line (Effective 9/19/2017)
For further information, please contact us by sending an email to iebrineline@sawpa.gov.