This work shall include procurement and installation of two (2) dual port electric vehicle chargers according to the attached Scope of Work in Appendix D at the SAWPA Building at 11615 Sterling Avenue, Riverside, CA 92503. The new electric vehicle chargers shall include necessary conduit upgrades to support up to five (5) dual port EV chargers (Level 2). Please see the attached Scope of Work in Appendix D for technical details.
Proposals must be submitted and uploaded onto Planet Bids at: https://vendors.planetbids.com/portal/52676/bo/bo-detail/133921 as a complete electronic/PDF file by no later than 10/30/2025 4:00 PM (PST).